2013-07-02 - More Prep Work

Roughly Leveled About 2/3 of the Length

I did not sleep well and got up early the napped on the couch until 11:00. I worked about an hour and got quite a bit done. I came in and ate and goofed off until about 7:00 then went out and finished the rough grading including widening the bed to give plenty of room to set the frame in.

The materials are to come between 12:00 and 5:00 tomorrow afternoon. My first chore will be to bring all the blocks into the back yard to eliminate the possibility of theft. The sand will be in 4 750 pound bags so it is harder to imagine anyone absconding with it at least without a forklift.

Ready to Put in Frame and do Final Leveling